List of Goverment Clients

List of Civil Clients

 

 

Contracts carried out in recent years
for Government Establishments

RAF Molesworth: buildings for Cruise missiles.

RAF High Wycombe: stores building.

RAF Alconbury: vehicle workshops.

Army Training Centre, Warcop, Cumbria: tank training buildings and vehicle workshops - January 1996.

EMHB, HMNB Devonport: garage workshop - March 1996.

M.O.D. Hythe Ranges: steel and timber stores - February 1997.

for Major Industrial Companies

British Nuclear Fuels, Cumbria: various buildings.

Glaxo Group, Stevenage: pumphouses and compressor buildings.

T.M.L. at Dover and Folkestone: various buildings, including locomotive sheds.

Texaco Oil Refinery, Pembroke Dock, Wales: stores buildings.

 

 

 

 

 

Customer

Building

Date Supplied

Shepperton Studios

Shepperton

Middlesex

1 mo 15.om span x 24.7m long insulated with double sliding doors and 2 off personnel doors

Nov 2003

P.G. Technology Ltd.

Mitcham, Surrey

6.00m span x 13.9m long insulated with roller shutter door and personnel door

Nov 2003

Shepperton Studios Ltd.

Shepperton

Middlesex

1 no 12.0m span x 24.7m long insulated with double sliding doors and 2 personnel doors

Dec 2003

Twigden Homes

Arlesey, Bedfordshire

1 no. 12.0m span x 19.3m long uninsulated with double sliding doors and 2 personnel doors

Dec 2003

Braintree District Council

1 no. 9.0m span x 14.05m long, uninsulated with 6.0m eaves

Jan 2004

Oak Motors

Canterbury

Kent

1 no. 15.0m span x 13.9m long, insulated with roller shutter door and 2 off personnel doors.

 

Feb 2004

Godfrey Syrett Ltd

Newcastle

1 no. 12.0m span x 13.9m long, uninsulated with double sliding doors and 2 off personnel doors

Feb 2004

P.C. Harrington Contractors Ltd.

Southall

Middlesex

1 no. 15.0m span x 11.2m long insulated with electrically operated roller shutter doorand 2 off personnel doors

March 2004

John Myland Ltd.

Norwood

London

1 no. 7.32m span x 19.45m long insulated with 1 no. roller shutter door and 3 no. personnel doors.

March 2004

NUB Engineering Ltd

Motherwell

Scotland

1 no. 12.0m span x 11.0m long insulated with 1 off roller shutter to side and a personnel door

April 2004

Weardale Railways Ltd

Wolsingham Railway Centre

County Durham

1 no. 18.0m span x 49.0m long insulated with 4 off electrically operated roller shutter doors and 4 off personnel doors.

June 2004

G.F. Tomlinson Building Ltd.

NGT Training Centre

Eakring

Nottinghamshire

1 no 12.0m span x 30.1m long insulated with 2 off roller shutter doors and 2 personnel doors.

July 2004

Balfour Beatty Rail Plant Ltd.

Woking

Surrey

1. no 9.0m span x 43.75m long uninsulated with double sliding doors, double doorset and 2 personnel doors

August 2004

Pinewood Studios Ltd.

Iver Heath

Buckinghamshire

1 no. 16.0m span x 22.0m long insulated with double sliding doors and 2 off personnel doors.

August 2004

Pinewood Studios Ltd.

Iver Heath Buckinghamshire

1 no 15.0m span x 16.6m long insulated building with double sliding doors and 2 off personnel doors.

August 2004

Balfour Beatty Rail Plant Ltd.

Ruislip

Middlesex

1 no. 18.0m span x 13.0m long insulated with 1 no electrically operated roller shutter door and 2 off personnel doors.

November 2004

Powervac Ltd.

Glasgow

2 no. 6.0 m span x 4.2 m building extensions.

 

December 2004

P.C. Harrington Contractors Ltd.

Southall

Middlesex

1 no. 8.0 m span x 32.8 m long insulated, with roller shutter door, I1 no.double doorset and 3 off personnel doors.

January 2005

Balfour Beatty Railplant

Sandiacre

Nottingham

1 no. 15 m span x 40.9 m long insulated with 2 no. electrically operated roller shutter doors and 4 off personnel doors.

March 2005

Day Aggregates

Battersea

London

1 no 7.32m span x 11.2 m long insulated with roller shutter door and personnel door

June 2005

A.G. Barr plc.

Cumbernauld

Glasgow

1. no.12.00m span x 8.5m long insulated with double sliding doors, personnel door and extended rooflights.

June 2005

Hochiki Europe (U.K.) Ltd.

Gillingham,

Kent.

1 no. 18.00 metre span x 19.3m long insulated with 1 no. roller shutter door and 3 no. personnel doors.

July 2005

BBT Thermotechnology

Warndon

Worcestershire

1 no. 12.00m span 4 module extension to existing building

August 2005

G.C. Hurrell & Co. Ltd.

Strood

Kent

1 no. 18m span x 19.3m long, insulated with 3 off electrically operated roller shutter doors and 2 off personnel doors.

September 2005

SDC Special Projects

Glaxo Smithkline

Stevenage

1 no. 9.00m span x 11.35m long, uninsulated with double sliding doors and personnel door.

October 2005

Kimberley Clark

Northfleet Kent

1 no. 7.32m span x 8.65m long and 4.5m eaves.

Non insulated with double sliding doors and personnel door

October 2005

H.S.W. Timber Co. Ltd.

Brasted Kent

1 no. 12.oom span x 16.6 m long, uninsulated with double sliding doors and 2 personnel doors.

October 2005

North Midland Construction Ltd.

H.M.P. Everthorpe

East Yorkshire

1 no. 7.32m span x 5.8m long, insulated with a double personnel doorset .

December 2005

Safety Castings Ltd.

Bangor, Gwynedd

9.00m span x 13.5m long, insulated with double sliding doors, roller shutter door and 2 personnel doors

December 2005

H.S.W. Timber Co. Ltd.

Brasted Kent

1 no. 6.00m span x 13.9m long and 4.85m eaves. Insulated with 2 personnel doors c/w vision panels and 11 off frames for uPVC window frames.

December 2005

H.S.W. Timber Co. Ltd.

Brasted Kent

1 no. 9.00m span x 11.35m long uninsulated with double sliding doors and personnel door

December 2005

McAlpine & Co. Ltd.

Hillington

Glasgow

7.32m span x 22.00 m long, insulated with openings to sidewall and personnel doors

February 2006

S.E. Trains

Newington Road

Ramsgate Kent

1 no. 12.00m span x 43.6m long, insulated with double sliding doors and personnel doors

February 2006

SDC Special Products

Glaxo Smithkline

Stevenage

1 no. 7.32m span x 8.5m long, insulated with P.V.C. strip curtain to goods entrance and personnel door.

May 2006

Hewden Property Department Aberdeen

 

 

1 no. 9.00m span x 11.35m long, insulated with double sliding doors and personnel door.

May 2006

.