Building |
Date Supplied |
|
|
Shepperton
Studios Shepperton Middlesex |
1 mo 15.om span x 24.7m long insulated with double
sliding doors and 2 off personnel doors |
Nov 2003 |
|
P.G.
Technology Ltd. Mitcham, |
6.00m span x 13.9m long insulated with roller
shutter door and personnel door |
Nov 2003 |
|
Shepperton
Studios Ltd. Shepperton Middlesex |
1 no 12.0m span x 24.7m long insulated with double
sliding doors and 2 personnel doors |
Dec 2003 |
|
Twigden
Homes Arlesey,
Bedfordshire |
1 no. 12.0m span x 19.3m long uninsulated with
double sliding doors and 2 personnel doors |
Dec 2003 |
|
Braintree
District Council |
1 no. 9.0m span x 14.05m long, uninsulated with
6.0m eaves |
Jan 2004 |
|
Oak
Motors |
1 no. 15.0m span x 13.9m long, insulated with
roller shutter door and 2 off personnel doors. |
Feb 2004 |
|
Godfrey
Syrett Ltd |
1 no. 12.0m span x 13.9m long, uninsulated with
double sliding doors and 2 off personnel doors |
Feb 2004 |
|
P.C.
Harrington Contractors Ltd. Southall Middlesex |
1 no. 15.0m span x 11.2m long insulated with
electrically operated roller shutter doorand 2 off personnel doors |
March 2004 |
|
John
Myland Ltd. |
1 no. 7.32m span x 19.45m long insulated with 1 no.
roller shutter door and 3 no. personnel doors. |
March 2004 |
|
NUB
Engineering Ltd Motherwell |
1 no. 12.0m span x 11.0m long insulated with 1 off
roller shutter to side and a personnel door |
April 2004 |
|
Weardale
Railways Ltd Wolsingham
Railway Centre |
1 no. 18.0m span x 49.0m long insulated with 4 off
electrically operated roller shutter doors and 4 off personnel doors. |
June 2004 |
|
G.F.
Tomlinson Building Ltd. NGT
Training Centre Eakring Nottinghamshire |
1 no 12.0m span x 30.1m long insulated with 2 off
roller shutter doors and 2 personnel doors. |
July 2004 |
|
Balfour
Beatty Rail Plant Ltd. |
1. no 9.0m span x 43.75m long uninsulated with
double sliding doors, double doorset and 2 personnel doors |
August 2004 |
|
Pinewood
Studios Ltd. Iver
Heath Buckinghamshire |
1 no. 16.0m span x 22.0m long insulated with double
sliding doors and 2 off personnel doors. |
August 2004 |
|
Pinewood
Studios Ltd. Iver
Heath Buckinghamshire |
1 no 15.0m span x 16.6m long insulated building
with double sliding doors and 2 off personnel doors. |
August 2004 |
|
Balfour Beatty
Rail Plant Ltd. Ruislip Middlesex |
1 no. 18.0m span x 13.0m long insulated with 1 no
electrically operated roller shutter door and 2 off personnel doors. |
November 2004 |
|
Powervac
Ltd. |
2 no. 6.0 m span x 4.2 m
building extensions. |
December 2004 |
|
P.C.
Harrington Contractors Ltd. Southall Middlesex |
1 no. 8.0 m span x 32.8 m long insulated, with
roller shutter door, I1 no.double doorset and 3 off personnel doors. |
January 2005 |
|
Balfour
Beatty Railplant Sandiacre |
1 no. 15 m span x 40.9 m long insulated with 2 no.
electrically operated roller shutter doors and 4 off personnel doors. |
March 2005 |
|
Day
Aggregates Battersea |
1 no 7.32m span x 11.2 m long insulated with roller
shutter door and personnel door |
June 2005 |
|
A.G. Barr
plc. Cumbernauld
|
1. no.12.00m span x 8.5m
long insulated with double sliding doors, personnel door and extended
rooflights. |
June 2005 |
|
Hochiki
Europe ( |
1 no. 18.00 metre span x 19.3m long insulated with
1 no. roller shutter door and 3 no. personnel doors. |
July 2005 |
|
BBT
Thermotechnology Warndon Worcestershire |
1 no. 12.00m span 4 module extension to existing
building |
August 2005 |
|
G.C.
Hurrell & Co. Ltd. Strood |
1 no. 18m span x 19.3m long, insulated with 3 off
electrically operated roller shutter doors and 2 off personnel doors. |
September 2005 |
|
SDC
Special Projects Glaxo
Smithkline |
1 no. 9.00m span x 11.35m long, uninsulated with
double sliding doors and personnel door. |
October 2005 |
|
Northfleet
|
1 no. 7.32m span x 8.65m
long and 4.5m eaves. Non insulated with double sliding doors and
personnel door |
October 2005 |
|
H.S.W.
Timber Co. Ltd. Brasted |
1 no. 12.oom span x 16.6 m long, uninsulated with
double sliding doors and 2 personnel doors. |
October 2005 |
|
North
Midland Construction Ltd. H.M.P.
Everthorpe |
1 no. 7.32m span x 5.8m long, insulated with a
double personnel doorset . |
December 2005 |
|
Safety
Castings Ltd. |
9.00m span x 13.5m long, insulated with double
sliding doors, roller shutter door and 2 personnel doors |
December 2005 |
|
H.S.W.
Timber Co. Ltd. Brasted |
1 no. 6.00m span x 13.9m
long and 4.85m eaves. Insulated with 2 personnel doors c/w vision panels and
11 off frames for uPVC window frames. |
December 2005 |
|
H.S.W.
Timber Co. Ltd. Brasted |
1 no. 9.00m span x 11.35m long uninsulated with
double sliding doors and personnel door |
December 2005 |
|
McAlpine
& Co. Ltd. Hillington |
7.32m span x 22.00 m long, insulated with openings
to sidewall and personnel doors |
February 2006 |
|
S.E. Trains Ramsgate |
1 no. 12.00m span x 43.6m long, insulated with
double sliding doors and personnel doors |
February 2006 |
|
SDC
Special Products Glaxo
Smithkline |
1 no. 7.32m span x 8.5m long, insulated with P.V.C.
strip curtain to goods entrance and personnel door. |
May 2006 |
|
Hewden
Property Department |
1 no. 9.00m span x 11.35m long, insulated with
double sliding doors and personnel door. |
May 2006 |
.