Storage / Workshop Building. 11.8 metre span x 43.8 metres long x 5.51 metres eaves.
Specification included 2 no. 3 phase operated insulated roller shutter doors, an internal partition with 60 minute fire insulation and 3 no. personnel doors.
Erection completed in approximately 16 days.